Tie-down Vector Dynamics Foundation System for Wind Zones l Manuale Utente Pagina 12

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 24
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 11
Vector Dynamics System
for Concrete Applications
Instructions (3 of 3)
Single Longitudinal System
#59036
Double Longitudinal System
#59046
18. InstalllongitudinalframebracketstoI-beam(donottighten).
19. Attach longitudinal strut to frame bracket and vector pad.
20. Pull frame bracket clamps with fastened strut outward to remove any slack.
21. Tighten all nuts and bolts on struts and beam clamps.
3/4"
17/32"
from end
Strut
or
Swivel Strap
Connection
Frame Tie
Connection
Struts can be cut
to any size needed
3/4"
17/32"
from end
Strut
or
Swivel Strap
Connection
Frame Tie
Connection
Struts can be cut
to any size needed
3/4"
17/32"
from en
d
Strut
or
Swivel Strap
Connection
Frame Tie
Connection
Struts can be cut
to any size needed
3/4"
17/32"
from end
Strut
or
Swivel Strap
Connection
Frame Tie
Connection
Struts can be cut
to any size needed
12 Revised: 8/19/08
Vedere la pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 23 24

Commenti su questo manuale

Nessun commento